Oil and Gas Activities in Indonesia in 2020

The upstream oil and gas industry of Indonesia invested 10.21 billion US dollars and performed well in 2020 according to SKK Migas, the special task force in charge of upstream oil and gas activities of oil companies in Indonesia.

The oil and gas industry of Indonesia successfully met and even exceeded some of the 2020 targets that were set by the Indonesian government in the following key areas:

  1. Reserve Replacement ratio (RRR).
  2. Oil lifting
  3. Controlling the cost recovery
  4. Revenue intake by the government
  5. Completion of oil and gas projects

RESERVE REPLACEMENT RATIO

The reserve replacement ratio in 2020 is 101.6%. The oil industry added 705 MMBOE of reserve in 2020.  

OIL AND GAS PRODUCTION

The average daily oil lifting in 2020 is 706,000 BOPD. This exceeded the government target of 705,000 BOPD.

However, daily gas production in 2020 is 5461 MMSCFD. This is below the government target of 5556 MMSCFD.

COST RECOVERY

The amount of cost recovery in 2020 is US$ 8.12 billion which is in line with the government expectations.

OIL REVENUE TO GOVERNMENT

The oil industry contributed US$ 8.4 billion of revenues to the Indonesian government. This amount is 41% higher than the expected amount of US$5.86 billion.

COMPLETION OF EXPLORATION AND PRODUCTION PROJECTS

Fifteen oil and gas projects went on stream in 2020. These new projects added 9182 barrels of oil per day and 111 million SCF of gas per day.

3199 Km of 2D seismic and 1251 Km2 of 3D seismic surveys were completed in 2020.

SKK Migas was active and running in 2020 to keep the oil and gas exploration and production activities at a high level. Here are some of the key actions that SKK Migas undertook in 2020: 

  • SKK Migas signed twenty-four PSC side letters and sixty-one letters of agreement (LoA).
  • The government reduced the prices of gas sold to domestic companies to stimulate economic growth.
  • Allowing oil and gas operators to delay topping up the Abandonment and Site Restoration fund.
  • Eliminating the costs to oil operators of using government assets in their exploration and production activities.
  • Allowing oil companies to accelerate asset appreciation.
  • SKK Migas and Chevron Pacific Indonesia signed the Heads of Agreement to ensure the continuity of a high level of activities such as well drilling and production optimization in the Rokan Block during the final phase of the PSC contract. Chevron will hand over the operatorship of The Rokan block to Pertamina when its production sharing contract expires in August 2021.
  • SKK Migas approved the Plan of Development (POD) submitted by Repsol for the development of the huge Kaliberau gas field having 445 billion SCF of gas reserve in the Sakakemang block. The total investment in this project is estimated at 359 million US dollars.

PERFORMANCE OF THE OIL AND GAS OPERATORS IN 2020

Here are the top nine oil and gas operators who exceeded their oil production targets in 2020.

  • Chevron Pacific Indonesia
  • Pertamina Hulu Mahakam
  • Pertamina Hulu Energi ONWJ  
  • Pertamina Hulu Energi OSES
  • Petrochina International Jabung
  • Medco E & P Natuna
  • Pertamina Hulu Sanga Sanga
  • Medco E&P Rimau
  • JOB Pertamina – Medco Tomori Sulawesi

Here are the top nine oil and gas operators who exceeded their gas production targets in 2020.

  • BP Berau
  • Pertamina Hulu Mahakam
  • Eni Muara Bakau BV
  • JOB Pertamina – Medco Tomori Sulawesi
  • Premier Oil Indonesia
  • Petrochina International Jabung
  • Medco E & P Natuna
  • Kangean Energi Indonesia
  • Pearl Oil (Sebuku)

EXPLORATION AND PRODUCTION TARGETS FOR 2021

Being optimistic that Indonesia will meet the target of 1 million BOPD and 12 BSCFD of gas by 2030, SKK Migas is committed to keeping oil and gas production high in 2021. Here are its ambitious targets for oil and gas activities in 2021:

  • Daily oil production – 705,000 BOPD. This is the same target as in 2020.
  • The number of exploration wells – 43. This is a significant increase from 28, the actual number of exploration wells drilled in 2020.
  • The number of development wells – 616. This target is much higher compared with the 240 development wells drilled in 2020.
  • Number of workovers – 615
  • Number of well services – 26,431
  • 2-D seismic survey – 3569 Km
  • 3-D seismic survey – 1549 Km2

The Indonesian oil industry performed well in 2020. Mr. Dwi Soetjipto, the head of SKK Migas said: “The year 2020 was a difficult year for many oil operators due to the Covid 19 pandemic and the low oil prices. Nevertheless, the oil industry of Indonesia was able to meet several targets set by the government. Hopefully, this will help the country’s economy.”

This blog article is adapted from “Kinerja Hulu Migas Gemilang Sepanjang 2020” published by SKK Migas on 4 January 2021.

This article is adapted from SKK Migas news by Jamin Djuang – Chief Learning Officer of LDI Training.

Performance of Oil Industry of Indonesia in 2019

IMG_4902
Power Plant at North Jakarta, Indonesia

 

Oil companies in Indonesia and SKK Migas were buzzing with activities and excitement in 2019.

Exploration and Production Results

First, here are the combined performance results of the exploration and production activities of all the oil and gas production sharing contractors in Indonesia operating under the supervision of SKK Migas in 2019:

  • Total number of active work areas: 201
  • Average daily crude oil production: 746,000 BOPD
  • Average daily gas production: 5934 MMSCFD
  • Combined total daily oil and gas production: 1,806,000 BOEPD
  • The total value of the investment: 11.49 Billion USD
  • Number of development wells completed: 322
  • Number of exploration wells drilled: 36
  • The volume of oil and gas in place discovered: 113 BBOE  
  • 2-D seismic surveys completed: 12169 KM
  • 3-D seismic survey completed: 6837 KM2

On the oil and gas discovery front, it is nice to note that REPSOL and partners PETRONAS and MOECO discovered a giant gas field in February 2019 in the Sakakemang block in South Sumatera. With 2 trillion cubic feet of recoverable gas reserves, it is one of the largest gas discoveries in the world in 2019 and also the most significant gas discovery in Indonesia in the last 18 years.

On new field development, Inpex Indonesia and SKK Migas made significant progress in developing the huge Abadi gas field and constructing the LNG plant. It was decided the LNG plant will be built in the Yamdena Island in the Maluku province of Indonesia.

The 15 Largest Oil Producers in Indonesia

Here are the 15 largest oil producers operating under the production sharing system in Indonesia in 2019:

  • ExxonMobil Cepu
  • Chevron Indonesia
  • Pertamina EP
  • Pertamina Hulu Mahakam
  • Pertamina Hulu Energi Offshore North West Java (PHE ONWJ)
  • Pertamina Hulu Energi Offshore South East Sumatera (PHE OSES)
  • PetroChina International Jabung
  • Medco E&P Natuna
  • Petronas Carigali Ketapang
  • Pertamina Hulu Kalimantan Timur
  • BOB Bumi Siak Pusako Pertamina Hulu
  • Pertamina Hulu Sanga Sanga
  • Medco E&P Rimau
  • JOB Pertamina Medco Tomori Sulawesi
  • ConocoPhillips Grissik

The 15 largest natural gas producers in 2019

Here are the 15 largest gas producers in Indonesia in 2019:

  • BP Berau
  • ConocoPhillips Grissik
  • Pertamina EP
  • Pertamina Hulu Mahakam
  • ENI Muara Bakau
  • JOB Pertamina Medco Tomori Sulawesi
  • Premier Oil Indonesia
  • PetroChina International Jabung
  • Medco EP Natuna
  • Kangean Energy Indonesia
  • PHE West Madura Offshore
  • Pertamina Hulu Energi Jambi Merang
  • Husky-CNOOC Madura
  • Mubadala Petroleum Indonesia
  • PHE Offshore North West Java

 

The SKK Migas

The SKK Migas of Indonesia has also been very proactive in its roles as the supervisor of the production sharing contractors to facilitate their exploration and production activities.

With the vision to increase the oil production in Indonesia to one million barrels per day by 2030, SKK Migas instituted the Integrated Operation Center (IOC) and the One Door Service Policy (ODSP) in 2019.

The Integrated Operation Center (IOC)

 SKK Migas launched the Integrated Operation Center (IOC) in 2019. With the IOC, SKK Migas now has online and realtime access to information and data related to the exploration, drilling and production activities of the production sharing contractors in all work areas.

The  IOC allows SKK Migas to monitor the daily field activities of all operators, understand the field situations and make prompt recommendations.

The objectives of SKK Migas in establishing the OIC are to keep the oil and gas operations go smoothly and achieve the production targets.

Currently here is the information that is being monitored by the Integrated Operation Center:

  • Oil and gas production (Production Dashboard)
  • Oil and gas lifting (Oil and Gas Lifting Dashboard)
  • Stock Management (Stock Management Dashboard)
  • Plant Operation (Plant Information Management System – PIMS)
  • Facility Maintenance
  • Project Progress
  • Vessel tracking (Vessel Tracking Information System – VTIS)
  • Real-Time Drilling Operation
  • Emergency responses (Emergency Response Center – ERC)

The One Door Service Policy (ODSP)

SKK Migas also introduced One Door Service Policy (ODSP) in 2019. Through ODSP, the applications of all the permits related to exploration, drilling, field development, and production can be processed in one place.

SKK Migas will work with and support all the production sharing contractors in preparing the required documents and submitting the applications to obtain the various permits they need.

This is a very significant service because of the various types of permits that oil operators must apply. With this one-door policy, SKK Migas is hopeful that the various permits can be obtained promptly, and the oil and gas exploration and production targets can be achieved.

The One Door Service Policy consists of four work-groups that will help the production sharing contractors deal with the following type of permits:

  • Permits related to land acquisition and use 
  • Permits related to the environment, safety and security
  • Permits related to the use of resources and infrastructure
  • Permits related to the use of materials and human resources from outside Indonesia.

Several exploration and production targets were exceeded in 2019 and SKK Migas is hopeful the new 2020 targets can be achieved also by the end of the year.

This article is adapted from the information posted by SKK Migas.

 

 

The SKK Migas of Indonesia

SKK Migas – Satuan Kerja Khusus Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi – is a special task force that implements the production sharing contracts, develops the oil and gas upstream business and supervises the activities of the production sharing contractors in Indonesia.

SKK Migas is an institution created by the government of Indonesia based on the presidential regulation “Perpres Nomor 9 Tahun 2013 on the development and management of upstream oil and gas activities”.

SKK Migas is tasked to manage and supervise the upstream oil and gas activities – exploration, drilling, field development, and production – based on the production sharing contract system. It is established with the mission to ensure the exploration and production of the oil and gas will benefit the country and the people of Indonesia.

Here are the functions of SKK Migas:

  • Give considerations and recommendations to the Minister of Energy and Mineral Resources of Indonesia regarding the preparations and tenders of oil and gas work areas
  • Sign production sharing contracts
  • Study the development plan of a new oil and gas field in a work area, and submit the development proposal of the production sharing contractor for approval by the Minister of Energy and Mineral Resources
  • Give approval on the field development plan submitted by production sharing contractors
  • Approve the work program and budget of production sharing contractors
  • Monitor the operation and progress made by production sharing contractors and submit reports to the Minister of Energy and Mineral Resources
  • Appoint sellers of the produced oil and gas that will benefit the country.

These functions were originally carried out by BPPKA, a department under Pertamina, when the production sharing contract system was introduced in 1966. BPPKA (Badan Pembinaan Pengusahaan Kontraktor Asing) was later replaced by BP Migas. BP Migas later became SKK Migas in 2013.

To best serve and support the activities of oil operators around the country, SKK Migas has five field offices. They are:

  1. SKK Migas Sumatera Bagian Utara located in Pekanbaru
  2. SKK Migas Sumatera Bagian Selatan located in Palembang
  3. SKK Migas Kalimantan and Sulawesi located in Balikpapan
  4. SKK Migas Jawa, Bali, Madura dan Nusa Tenggara located in Surabaya
  5. SKK Migas Wilayah Papua dan Maluku located in Sorong

The current head of SKK Migas is Mr. Dwi Soetjipto. Its head office is located at Wisma Mulia, Jalan Gatot Subroto Kav. 42, Jakarta, Indonesia.